FPSO BW Maromba

Back to Projects
Client

BW Energy

Year

2025 – Ongoing

Phase

Repair and Life Extension and Pre-Ops Phases

Scope

  • Mobilization of regulatory engineers for site execution coordination and punch list item close-out.
  • Development of Regulatory Execution Plan and checklists.
  • Development of Regulatory RACI matrix, starter pack, and requirements for procurement.
  • Safety Studies review.
  • Engineering design review.
  • Regulatory Watch for continuous monitoring of changes and modifications in applicable rules and regulations.
  • Development of Helideck layout drawings and pre-inspections.
  • Development of ETEX M radio station specification and pre-inspection.
  • Helideck and ETEX M radio station final approval and homologation by the Brazilian Navy.
  • Revision and translation of Metering documentation.
  • Development of Regulatory Work Packs for Shipyard and Vendors.
  • NR-10 Electrical Installation inspections and final dossier compilation.
  • Piping Integrity inspections and P&ID mark-up.
  • NR-13 Pressure Vessels dossier compilation, design review, and site inspections.
  • NR-33 Confined Space surveys and development of confined space drawings.
  • Operating Manuals translation from English to Brazilian Portuguese.

Discuss a Similar Scope

Contact Qiji to discuss your project requirements.

Contact Us